- LocationMilan - Linate Airport
- CountryItaly
- ClientSEA (Società per Azioni Esercizi Aeroportuali)
- Year2019
- Scope of worksSite Supervision
- Credits-
Redevelopment of Building F (civil and MEP works) and upgrading of runway 18/36, Milan – Linate Airport
The upgrading and redevelopment of the Linate Passenger Terminal concert to a increase of the Buildings F and F/2: total reconstruction of the Building F and the partial reconstruction of the Building F/2 and the structural reinforcement of the first basement floor, occupied by the refrigeration plant. The works also include the upgrade of runway 18/36 and taxiway. F&M Ingegneria has supported SEA for the site supervision of the works with specialized site inspectors for the logistic control of the activities.