{"id":6088,"date":"2021-06-03T09:00:00","date_gmt":"2021-06-03T09:00:00","guid":{"rendered":"https:\/\/fm-ingegneria.com\/fm-post\/fm-post-6-polo-logistico-per-il-gruppo-teddy-2\/"},"modified":"2021-06-03T09:00:00","modified_gmt":"2021-06-03T09:00:00","slug":"fm-post-6-polo-logistico-per-il-gruppo-teddy-2","status":"publish","type":"fm_post","link":"https:\/\/fm-ingegneria.com\/en\/fm-post\/fm-post-6-polo-logistico-per-il-gruppo-teddy-2\/","title":{"rendered":"F&#038;M Post #6 | POLO LOGISTICO PER IL GRUPPO TEDDY"},"content":{"rendered":"<p>The sixth issue, F&#038;M Post #6, focuses on the new distribution centre for the Teddy Group in Gatteo (FC), a few kilometres from the Group&#8217;s historic headquarters in Rimini and close to the Valle del Rubicone motorway exit. The new logistics hub, equipped with the most modern logistics and goods-handling technologies, covers a total area of more than 79,000 sqm, equivalent to nine football pitches. The client&#8217;s attention to environmental sustainability was decisive in guiding the choices across the various design and construction disciplines.<\/p>\n","protected":false},"featured_media":6083,"template":"","class_list":["post-6088","fm_post","type-fm_post","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/fm_post\/6088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/fm_post"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/fm_post"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/6083"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=6088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}