{"id":2891,"date":"2019-01-28T09:42:32","date_gmt":"2019-01-28T08:42:32","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/sassa-school-complex-on-archdaily-en\/"},"modified":"2019-01-28T09:42:32","modified_gmt":"2019-01-28T08:42:32","slug":"sassa-school-complex-on-archdaily-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/sassa-school-complex-on-archdaily-en\/","title":{"rendered":"Sassa school complex on Archdaily"},"content":{"rendered":"<p>Thank you\u00a0ArchDaily\u00a0for this interesting article about our Sassa School Complex.<br \/>\nThe project is part of the post-earthquake reconstruction works in L&#8217;Aquila and will be realized together with a multidisciplinary team composed of SET Architects (Architecture),\u00a0F&amp;M Ingegneria\u00a0(Engineering and Sustainability) and LAND srl\u00a0(Landscape). Click <a href=\"https:\/\/www.archdaily.com\/910101\/set-architects-climbing-frame-inspired-sassa-school-prioritizes-adaptability\" target=\"_blank\" rel=\"noopener\">here<\/a> for more.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Thank you\u00a0ArchDaily\u00a0for this interesting article about our Sassa School Complex. The project is part of the post-earthquake reconstruction works in L&#8217;Aquila and will be realized together with a multidisciplinary team composed of SET Architects (Architecture),\u00a0F&amp;M Ingegneria\u00a0(Engineering and Sustainability) and LAND srl\u00a0(Landscape). Click here for more.<\/p>\n","protected":false},"author":0,"featured_media":526,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-2891","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2891","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=2891"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2891\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/526"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=2891"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}