{"id":2952,"date":"2019-11-14T17:42:09","date_gmt":"2019-11-14T16:42:09","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/arcadia-center-progetto-e-cantiere-gestiti-in-bim-en\/"},"modified":"2026-06-12T09:37:19","modified_gmt":"2026-06-12T09:37:19","slug":"arcadia-center-progetto-e-cantiere-gestiti-in-bim-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/arcadia-center-progetto-e-cantiere-gestiti-in-bim-en\/","title":{"rendered":"Arcadia Center: BIM for design &#038; construction"},"content":{"rendered":"<p>The design has been developed with BIM modeling and was aimed to create a new facade system able to integrate technology, environmental sustainability and energy efficiency to ensure the maximum comfort in the working spaces. F&amp;M Ingegneria carried out the structural design, site supervision and H&amp;S. Click <a href=\"https:\/\/www.impresedilinews.it\/arcadia-center-progetto-e-cantiere-gestiti-in-bim\/\" target=\"_blank\" rel=\"noopener\">here<\/a> for more. Ph.\u00a0\u00a9Carola Merello<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The design has been developed with BIM modeling and was aimed to create a new facade system able to integrate technology, environmental sustainability and energy efficiency to ensure the maximum comfort in the working spaces. F&amp;M Ingegneria carried out the structural design, site supervision and H&amp;S. Click here for more. Ph.\u00a0\u00a9Carola Merello<\/p>\n","protected":false},"author":0,"featured_media":766,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-2952","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2952","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=2952"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2952\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/766"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=2952"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}