{"id":2964,"date":"2020-01-29T17:43:42","date_gmt":"2020-01-29T16:43:42","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/petronas-hq-trasparenza-e-dinamismo-en\/"},"modified":"2020-01-29T17:43:42","modified_gmt":"2020-01-29T16:43:42","slug":"petronas-hq-trasparenza-e-dinamismo-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/petronas-hq-trasparenza-e-dinamismo-en\/","title":{"rendered":"Petronas HQ &#8211; Trasparency and Dynamism"},"content":{"rendered":"<p>Two linked buildings, with GFA of 17,000 sqm, for laboratories, industrial and office composed the new HQ of Petronas in Italu. Designed with a view to sustainability and well-being, the internal layout dematerializes the structural aspect, ensuring brightness, transparency and visual cleanliness.<\/p>\n<p>F&amp;M Ingegneria carried the structural and MEP design and the construction management, with 967 Associated Architects and Broadway Malyan London for the architectural design.<\/p>\n<p>Download of the full text in the link on the left.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two linked buildings, with GFA of 17,000 sqm, for laboratories, industrial and office composed the new HQ of Petronas in Italu. Designed with a view to sustainability and well-being, the internal layout dematerializes the structural aspect, ensuring brightness, transparency and visual cleanliness. F&amp;M Ingegneria carried the structural and MEP design and the construction management, with [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":818,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-2964","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2964","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=2964"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/2964\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/818"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=2964"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}