{"id":3063,"date":"2021-12-03T10:55:22","date_gmt":"2021-12-03T09:55:22","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/the-works-for-restoration-of-the-former-magazzino-del-sale-darsena-have-been-completed-en\/"},"modified":"2021-12-03T10:55:22","modified_gmt":"2021-12-03T09:55:22","slug":"the-works-for-restoration-of-the-former-magazzino-del-sale-darsena-have-been-completed-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/the-works-for-restoration-of-the-former-magazzino-del-sale-darsena-have-been-completed-en\/","title":{"rendered":"The works for restoration of the former &#8220;Magazzino del Sale &#8211; Darsena&#8221; have been completed!"},"content":{"rendered":"<p>The project preserves the building covered by heritage law D.Lgs. 42\/2004, and provides a new multifunctional building linked to the tourism, catering and wellness sector for public\/private use: spaces for the community and wellness spaces will intertwine at various levels.<\/p>\n<p>The project is commissioned by the Municipality of Cervia and financed by t the Operational Programme of the European Regional Development Fund &#8220;POR-FESR EMILIA ROMAGNA 2014-2020 &#8211; Axis 5 &#8211; Az. 6.7.1 Project &#8220;ABCD Cervia &#8211; simply Art, Wellness, Food at the Dock&#8221;.<\/p>\n<p>F&amp;M carried out the structural and MEP design and site supervision and H&amp;S coordination as well, teaming with Antonio Ravalli Architects for architectural design and site supervision.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project preserves the building covered by heritage law D.Lgs. 42\/2004, and provides a new multifunctional building linked to the tourism, catering and wellness sector for public\/private use: spaces for the community and wellness spaces will intertwine at various levels. The project is commissioned by the Municipality of Cervia and financed by t the Operational [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":1194,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3063","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=3063"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3063\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/1194"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=3063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}