{"id":3102,"date":"2022-10-07T11:12:40","date_gmt":"2022-10-07T09:12:40","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/sardine-tuna-cannery-plant-en\/"},"modified":"2022-10-07T11:12:40","modified_gmt":"2022-10-07T09:12:40","slug":"sardine-tuna-cannery-plant-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/sardine-tuna-cannery-plant-en\/","title":{"rendered":"Sardine &#038; Tuna Cannery Plant"},"content":{"rendered":"<p>F&amp;M Middle East is undertaking the Lead Consultancy for the Design, Project Management, and Supervision Services of Sardine &amp; Tuna Cannery Plant and Ancillary at Duqm, Oman.<\/p>\n<p>&#8211;<\/p>\n<p>The \u201cSardine &amp; Tuna Cannery Plant\u201d project aims to create a processing model able to collect fish from different areas of the country through both artisanal and professional fishing methods and process them into high-quality canned sardines, canned tuna, along with its by-products such as fish meal and fish oil for the domestic market and export.<\/p>\n<p>The project will create investment opportunities to ensure the ready availability of fisheries products and the localization of the fish product value chain, contributing to the GDP.<\/p>\n<p>The project currently under construction is located within the SEZAD Fisheries zone in Al Duqm, Al Wusta Governorate, Sultanate of Oman and is expected to start production by Q1 2024.<\/p>\n<p>&nbsp;<\/p>\n<p>Click <a href=\"https:\/\/lnkd.in\/dY_a5eFm\" target=\"_blank\" rel=\"noopener\">here<\/a> for more.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>F&amp;M Middle East is undertaking the Lead Consultancy for the Design, Project Management, and Supervision Services of Sardine &amp; Tuna Cannery Plant and Ancillary at Duqm, Oman. &#8211; The \u201cSardine &amp; Tuna Cannery Plant\u201d project aims to create a processing model able to collect fish from different areas of the country through both artisanal and [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":1306,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=3102"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3102\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/1306"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=3102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}