{"id":3107,"date":"2022-11-28T12:12:55","date_gmt":"2022-11-28T11:12:55","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/executive-design-and-contract-execution-of-the-rail-link-to-venice-marco-polo-airport\/"},"modified":"2022-11-28T12:12:55","modified_gmt":"2022-11-28T11:12:55","slug":"executive-design-and-contract-execution-of-the-rail-link-to-venice-marco-polo-airport","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/executive-design-and-contract-execution-of-the-rail-link-to-venice-marco-polo-airport\/","title":{"rendered":"Executive design and contract execution of the rail link to Venice Marco Polo Airport"},"content":{"rendered":"<p><a href=\"https:\/\/www.linkedin.com\/company\/rete-ferroviaria-italiana\/\" target=\"_blank\" rel=\"noopener\">RFI Rete Ferroviaria Italiana<\/a>\u00a0has awarded the works for the construction of the Railway Link to Marco Polo Airport in\u00a0Venice\u00a0to the grouping of companies\u00a0Rizzani de Eccher\u00a0(lead contractor),\u00a0Manelli Impresa and Sacaim. The executive design is by Lombardi Ingegneria Srl<b> <\/b>e F&amp;M Ingegneria.<\/p>\n<p>The tender is worth more than 428 million euros, also financed with PNRR funds.<\/p>\n<p>The project is part of a strategy by RFI Rete Ferroviaria Italiana and the Italian State Railways Group to improve rail links to airports, encourage\u00a0intermodality\u00a0and increase\u00a0tourism. The goal is to increase the modal shift to rail of passengers traveling to Venice airport via the new approximately 8-kilometer double-track rail line that will connect Venice to Marco Polo Airport<\/p>\n<p>To learn more, read the full article <a href=\"https:\/\/www.fsnews.it\/it\/focus-on\/infrastrutture\/2022\/11\/26\/rfi-gara-aeroporto-venezia.html\" target=\"_blank\" rel=\"noopener\">here<\/a>!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>RFI Rete Ferroviaria Italiana\u00a0has awarded the works for the construction of the Railway Link to Marco Polo Airport in\u00a0Venice\u00a0to the grouping of companies\u00a0Rizzani de Eccher\u00a0(lead contractor),\u00a0Manelli Impresa and Sacaim. The executive design is by Lombardi Ingegneria Srl e F&amp;M Ingegneria. The tender is worth more than 428 million euros, also financed with PNRR funds. The [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":1318,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=3107"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3107\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/1318"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=3107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}