{"id":3118,"date":"2023-03-10T14:44:59","date_gmt":"2023-03-10T13:44:59","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/work-on-the-new-access-road-to-the-macro-island-first-industrial-zone-of-marghera-completed\/"},"modified":"2023-03-10T14:44:59","modified_gmt":"2023-03-10T13:44:59","slug":"work-on-the-new-access-road-to-the-macro-island-first-industrial-zone-of-marghera-completed","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/work-on-the-new-access-road-to-the-macro-island-first-industrial-zone-of-marghera-completed\/","title":{"rendered":"Work on the new &#8220;Access road to the Macro island First Industrial Zone of Marghera&#8221; completed"},"content":{"rendered":"<p>The contract to develop the new connection between Mestre and Porto Marghera, Venice&#8217;s industrial area, was given to F&amp;M Ingegneria in 2018. The remodeling of this intersection included coping with constrained spaces, tracks on both sides of Via Libert\u00e0, and\u2014most importantly\u2014the impossibility of obstructing the largely always-guaranteed two lanes in and two lanes out traffic between Mestre and Venice.<\/p>\n<p>Work began in November 2019, but was expected to take a long time because of these factors. Not to mention that in between were the Covid years that delayed and blocked every construction site.<\/p>\n<p>To have completed this work is a great satisfaction.<\/p>\n<p>It is an ambitious project that fits into a context of profound urban transformation with an important meaning for the city and all those who frequent the university, Forte Marghera and San Giuliano Park.<\/p>\n<p>Thanks to all team members:<\/p>\n<p><a href=\"https:\/\/www.net-italia.com\/\" target=\"_blank\" rel=\"noopener\">NET Engineering<\/a>,\u00a0<a href=\"https:\/\/www.sogen.it\/\" target=\"_blank\" rel=\"noopener\">SOGEN srl<\/a>,\u00a0<a href=\"http:\/\/www.gvassociati.com\/\" target=\"_blank\" rel=\"noopener\">G&amp;V Ingegneri Associati SRL<\/a>, G&amp;T<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The contract to develop the new connection between Mestre and Porto Marghera, Venice&#8217;s industrial area, was given to F&amp;M Ingegneria in 2018. The remodeling of this intersection included coping with constrained spaces, tracks on both sides of Via Libert\u00e0, and\u2014most importantly\u2014the impossibility of obstructing the largely always-guaranteed two lanes in and two lanes out traffic [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":1420,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3118","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=3118"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3118\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/1420"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=3118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}