{"id":3200,"date":"2024-07-31T10:33:13","date_gmt":"2024-07-31T08:33:13","guid":{"rendered":"https:\/\/fm-ingegneria.com\/news\/sport-impianti-terrazza-a-mare-di-lignano-sabbiadoro-en\/"},"modified":"2024-07-31T10:33:13","modified_gmt":"2024-07-31T08:33:13","slug":"sport-impianti-terrazza-a-mare-di-lignano-sabbiadoro-en","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/sport-impianti-terrazza-a-mare-di-lignano-sabbiadoro-en\/","title":{"rendered":"Sport &#038; Impianti \u2013 Terrazza a mare in Lignano Sabbiadoro"},"content":{"rendered":"<p>Work has begun on the new Terrazza a mare in Lignano Sabbiadoro!<\/p>\n<p>By the spring of 2026, this iconic location will be renewed with an investment of 14 million euros.\u00a0 The project will not only enhance the existing structure but also add new attractions like an infinity pool and a panoramic restaurant. A major step forward for tourism and the local community.<\/p>\n<p>The design of the Terrazza a Mare is entrusted to the team composed of F&amp;M Ingegneria SpA \u2013 Capogruppo RTP (Engineering Design), Arch. Giulia de Appolonia, Carrilho da Gra\u00e7a Arquitectos lda (Architectural Design), SEMPER S.R.L. (Archaeology).<\/p>\n<p>&nbsp;<\/p>\n<p>Read the full article in <a href=\"https:\/\/www.sporteimpianti.it\/notizie\/partiti-lavori-per-la-terrazza-a-mare-di-lignano-sabbiadoro\/\" target=\"_blank\" rel=\"noopener\">Sport &amp; Impianti magazine here<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p>Images \u00a9GDA Arch. Giulia de Appolonia<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Work has begun on the new Terrazza a mare in Lignano Sabbiadoro! By the spring of 2026, this iconic location will be renewed with an investment of 14 million euros.\u00a0 The project will not only enhance the existing structure but also add new attractions like an infinity pool and a panoramic restaurant. A major step [&hellip;]<\/p>\n","protected":false},"author":0,"featured_media":1932,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-3200","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3200","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=3200"}],"version-history":[{"count":0,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/3200\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/1932"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=3200"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}