{"id":6553,"date":"2026-09-22T10:44:03","date_gmt":"2026-09-22T08:44:03","guid":{"rendered":"https:\/\/fm-ingegneria.com\/?p=6553"},"modified":"2026-09-22T10:44:03","modified_gmt":"2026-09-22T08:44:03","slug":"the-second-wing-of-the-p6-smart-multi-story-parking-garage-at-bologna-airport-has-been-inaugurated","status":"publish","type":"post","link":"https:\/\/fm-ingegneria.com\/en\/news\/the-second-wing-of-the-p6-smart-multi-story-parking-garage-at-bologna-airport-has-been-inaugurated\/","title":{"rendered":"The second wing of the P6 Smart multi-story parking garage at Bologna Airport has been inaugurated."},"content":{"rendered":"<p>With the inauguration of the second wing, the multi-story parking garage now has a total capacity of 2,218 parking spaces spread across eight levels.<\/p>\n<p>Work began in November 2023 and saw its first major milestone with the opening of Park A in July 2025, which provided 1,074 parking spaces. The subsequent completion of Park B added another 1,144 spaces, boosting the airport\u2019s parking capacity and improving services for passengers.<\/p>\n<p>F&amp;M Ingegneria oversaw the design, construction management, and safety coordination, contributing to the creation of a modern and functional infrastructure designed to enhance the passenger experience and support the airport\u2019s growth.<\/p>\n<p>We would like to thank Bologna Airport and all the organizations involved: AEC Costruzioni, PICHLER Projects, and Area Progetto.<\/p>\n<p>Read the news from <a href=\"https:\/\/www.bologna-airport.it\/la-societa\/sala-stampa\/news\/inaugurato-oggi-il-secondo-blocco-del-parcheggio-multipiano-p6-smart\/?idC=62350&amp;idO=3445543\" target=\"_blank\" rel=\"noopener\">Bologna Airport here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the inauguration of the second wing, the multi-story parking garage now has a total capacity of 2,218 parking spaces spread across eight levels. Work began in November 2023 and saw its first major milestone with the opening of Park A in July 2025, which provided 1,074 parking spaces. The subsequent completion of Park B [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":6550,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-6553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/6553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/comments?post=6553"}],"version-history":[{"count":2,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/6553\/revisions"}],"predecessor-version":[{"id":6555,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/posts\/6553\/revisions\/6555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media\/6550"}],"wp:attachment":[{"href":"https:\/\/fm-ingegneria.com\/en\/wp-json\/wp\/v2\/media?parent=6553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}