- Date24/07/2018
Installation of the prefabricated columns 30 m height in the yard of Stevanato Group
The first of the 48 prefabricated columns with a height of 30m is set in the yard of Stevanato Group in Piombino Dese (PD). The operation is 1 hour long for each column (for setting and balancing) is performed by two cranes that work simultaneously.



