- LocationFiumicino (RM)
- CountryItaly
- ClientADR Engineering Spa
- Year2013 - in progress
- Scope of worksTerminal Design, Structural Design
- Credits-
Upgrading of terminal and Hub Est (Lot 2) in “L. Da Vinci” airport
The project involves completion of the infrastructure works of the landside and airside terminals on the east side of the subsystem in order to enhance the user interface and the ability to acquire the Hub making volumetric architectural continuity. The project consists of the following stages: Extension of the west side of Terminal 1 of 10,700 square meters; Restructuring C of 8300 square meters Boarding Area; Adaptation of the Boarding Area D; New root node within the Boarding Area D of 2800 square meters.