- LocationTrieste
- CountryItaly
- ClientTMR - Trieste Marine Terminal
- Year2020 - in progress
- Scope of worksValue Engineering, Detailed Design Review
- Credits
Extension of Terminal Container in Molo VII
The project involves the first part of the structural works for the enlargement of the existing Pier VII with an addiction of an area 100×140 m.
The new quay is sized to accommodate Ship to Shore (STS) cranes of the Super-Post-Panamax type and an LHM 550 crane currently used by TMT. A container storage yard on 5+1 pitches is planned, served by a Rail Mounted Gantry (RMG) crane, mobile cranes, Reach Stackers and Side Loader.