- LocationSestri Ponente
- CountryItaly
- ClientPorto di Genova
- Year2020 - in progress
- Scope of worksStructural Design, MEP Design
- Credits
New dry dock Fincantieri Area
This is a series of interventions aimed, on the one hand, at securing the hydraulic safety of the Genoa urban area in the port basin of Multedo, included in the port of Genoa, and on the other hand to ensure the expansion and rationalisation of the areas dedicated to shipbuilding. These interventions which will allow, among other things, the construction of large ships
also through the construction of a new dry dock, are intended to encourage the development of the industrial and port areas behind it. In addition to the maritime works, the service also relates to hydraulic safety works, adaptation to workplace safety regulations, the the rationalisation of the accessibility of the Sestri Ponente industrial port area, the improvement of accessibility and the revision of the railway route.