Underground parking lot “Primo Maggio”

Client

VIDONI SpA per Sistema e Sosta Mobilità SpA

Location

Udine, Italy

Date of works

2012 - 2016

Underground parking lot “Primo Maggio”

The project involves construction of a 3 underground levels parking for 309 stands in Primo Maggio Square. The car parking is composed by an helical building and a trapezoidal building on 3 levels, connected by passageways. The project also includes the requalification of the square.

Services
Architectural Design, Geotechnical Design, Health & Safety, MEP Design, Project Management, Structural Design
Credits
Studio TI (Impianti), G&T srl (Geologia)
We build the future with expertise, vision and engineering excellence

Discover the F&M Ingegneria approach.

  • F&M Italia
  • F&M East Europe
  • F&M Infrastructure